Down-Time Minimized – Inventory Managed at Bobcat Contracting
Jun, 07 2021
Case Studies
With the addition of 3 new horizontal tanks, Bobcat Contracting LLC sought out a solution to manage inventory levels within their tanks in addition to minimizing downtime. Like many storage and fuel tanks, Bobcat Contracting would manually measure their fuel tank levels by sticking the tanks.